The process of securing a building permit in the City of Pompano Beach can seem complex, but with the right knowledge and guidance, it doesn't have to be a source of frustration. As the process has evolved, particularly with the implementation of digital systems, understanding the key steps is more crucial than ever.


Here at A to Z Permits LLC, we specialize in streamlining this process, saving you time, money, and headaches. Let's break down the essential steps for successfully navigating Pompano Beach's permitting system.


The Digital Evolution: ePermitsOneStop and ePlan


Pompano Beach has significantly modernized its permitting through two primary systems:


  • ePermitsOneStop: This centralized platform, in collaboration with Broward County, allows for the online submission of applications for both City of Pompano Beach building permits and associated Broward County permits (like Environmental and Consumer Protection Division approvals). This integration is a huge efficiency booster, often eliminating the need for separate, in-person trips.


  • ePlan Review: Once your application is created, the City utilizes the ePlan system for all electronic document and drawing submissions and the subsequent review process. This is where you upload your plans, receive reviewer comments, and submit any necessary corrections or revisions. Pompano Beach is essentially a 100% electronic process for permit submittal.


Crucial Pre-Submittal Requirements


Before you even upload your plans to ePlan, there are several foundational items you need to prepare:


  • The Application: You will need to complete the Uniform Building Permit Application (which often covers all trades like Building, Electrical, Mechanical, and Plumbing). Ensure all values, square footage, and quantities are accurately listed.


  • Contractor Registration: The contractor (or owner/builder affidavit) must be properly registered with the City, and a current copy of their State License and Insurance is required.


  • Notice of Commencement (NOC): For projects valued at $5,000 or more (or $15,000 for HVAC permits), the NOC must be recorded with Broward County Records and a certified copy must be submitted to the City.


  • Broward County Approvals: Depending on the scope of work, certain approvals may be required before the City will issue the permit, such as:

    • Environmental Protection Division (EPD) review for compliance with County codes.

    • Elevator plan review (if applicable).


The Streamlined "One Permit" Concept


One of the great features of the Pompano Beach system is the "One Permit" Concept.


  • Instead of pulling separate permits for plumbing, electrical, and mechanical work, the City often manages these trade applications under a single primary building permit. This unified approach simplifies the process for the applicant, contractor, and owner.


  • However, remember that each trade contractor must still submit their required information and be listed on the master permit application.


Navigating the Review and Correction Process


Once all your documents are uploaded to ePlan, the review process begins. This involves various City departments (Building, Zoning, Fire, Engineering) reviewing your plans for compliance with the Florida Building Code (FBC) and local ordinances.


  • Timely Corrections are Key: You will be notified via ePlan if corrections are required. The key to speed is a prompt and accurate response. All revisions must include a narrative detailing what was changed and clearly mark the corrections on the plans using "clouds and deltas."


  • Broward County Coordination: If your project also requires Broward County review through ePermitsOneStop, ensure you submit any County-required plan sets using the appropriate download button from your City ePlan project to their system.


Finalizing the Permit and Scheduling Inspections


Once all departments have approved the plans:


  1. Pay Fees: You will be notified that the permit is ready for issuance and the final fees must be paid.

  2. Permit Issuance: The permit is officially issued, and the work can begin.

  3. Inspections: The permit holder is responsible for scheduling all required inspections (e.g., foundation, framing, final electrical, etc.). For next-business-day service, inspections must typically be scheduled before 3:00 PM.


Why Use a Permit Expediter?


The City of Pompano Beach Building Department, while efficient, still requires meticulous attention to detail and consistent follow-up across multiple agencies (City, County EPD, etc.).


As your dedicated permit expediter, A to Z Permits LLC handles the entirety of this coordination:


  • Document Preparation: We ensure all forms are correct and that required pre-submittals (like the recorded NOC or EPD approvals) are completed.

  • ePlan Management: We manage the entire digital lifecycle—uploading, receiving comments, and accurately submitting revisions to minimize review time.

  • Communication: We act as the liaison between your team and the City/County reviewers, translating comments and driving the approval to issuance.